The next Chilled Water Planned Outage is scheduled for Feb. 19. 

In support of continued improvements to the system and to facilitate ongoing repairs at Harrison Square, I&S will conduct a planned TWO-HOUR outage Feb. 19. This outage will be similar in impact to that we just completed on Jan. 22.

Additionally, the following buildings will experience a 2-day outage (Feb. 19 – Feb. 20)

430N
430S
Baker
Dalney 

Looking forward, a planned outage during Spring Break will affect Klaus and Cherry Emerson for a 4-day period. Stay tuned for details.

The campus chilled water system serves cooling (air conditioning) needs in buildings connected to the district system. Outages will primarily affect spaces with high internal heat loads such as server rooms or process cooling loads dependent on campus chilled water. Most planned outages will occur during low campus occupancy to accommodate system repairs and improvements and to best enable reliable chilled water service to the campus. 

NOTE: If you came to this page via the QR code from construction fencing signage, the signage is correct. "Better Infrastructure = Better Campus". We all love reliable and efficient systems, but they require periodic upgrades or sometimes urgent attention. Click here to see details about the work on Cherry Street at Harrison Square.

Today's projects will result in an improved, more resilient campus.

Planned Chilled Water Outage Map

Buildings in red: TWO-HOUR outage planned for Feb. 19. These four buildings will experience a 2-day outage Feb. 19 – Feb. 20: 430N, 430S, Baker, and Dalney.

Buildings in blue: Not affected during this time.

Buildings in purple: Temporary chillers in use.

View List of Affected Buildings

View Planned Outage Map Fullscreen

Image
Feb2025_AffectedBuildings.png
Blank Space (small)
(text and background only visible when logged in)
Buzz at Harrison Square Construction
Jim Stevens at Construction Signage
Harrison Square Construction