Planned Outage Timeframe: Sat., Dec. 19 through Thurs., Dec. 31, 2026

In order to continue improvements to the chilled water distribution system, I&O will be executing a scheduled partial outage to chilled water service (building air conditioning) during the 2026 winter break period. No work will be completed on Fri., Dec. 25. 

List of Affected Buildings (indicated in red on map below):
Groseclose
ISyE (755 Ferst Drive)
Stamps Health Services
Callaway Manufacturing Research Center (MARC)
Manufactured Related Disciplines Complex (MRDC)
Old Civil Engineering
Dorothy M. Crosland Tower and S. Price Gilbert Library

Planned Chilled Water Outage Map

 

image of chilled water planned outage map of affected buildings
Blank Space (small)
(text and background only visible when logged in)

Better Infrastructure, Better Campus

OCTOBER 2026 UPDATE: Current work in Harrison Square is for a steam repair and should be complete by Fri., Oct. 16.

NOVEMBER 2025 UPDATE: D.M. Smith construction fencing has been removed. 

SEPTEMBER 2025 UPDATE: Harrison Square has fully reopened and all construction fencing has been removed. Construction fencing remains surrounding the D.M. Smith building as interior renovation work continues.

Construction workers working on a dug hole at Harrison Square on Tech campus
Buzz at Harrison Square Construction