12.03.18 - Commissioning Process at GT Part II
Overview of Cx at GT, Introduction of GT OPR and GT Cx Specificaitons.
Overview of Cx at GT, Introduction of GT OPR and GT Cx Specificaitons.
Tips for a smooth hand off of landscape projects to GT Landscape Services.
Training held on 2/12/18 to review PPV and GTFI Project processes. This is a good overview of PPV / GTFI projects.
List of access control systems in campus buildings and conversion schedule.
Process guide outline developed by BOR for Public-Private-Venture based projects. At GT, this is typically a GTFI project.
How to guide for D&C Shared Calendars: Meeting, Vacation, Drawing Review
Instructions on how to navigate in the Insite and Net FM space management software. Includes floor plans, CAD files, and a database for storing building and room data. Request for access to this system from CPSM.
PPV + GTFI Projects - Procedures Manual by GTFI
Projects that are owned by a public private venture (PPV), with specific lease requirements and certain project criteria, must go through Georgia Tech Facilities Inc for contracting. This checklist must be completed for all projects in the listed building when the PRF is submitted.