Completion Date
Image
Photo of Dalney building at night
Scope

The site is located between the Dalney and Greenfield Street corridors.  Approximately 3.0 acres that required grading and some utility relocation and some new installation. The parking garage will be of precast construction and house 784 parking spots. The garage structural design allows for future expansion vertically. The office building laminated on the south face of the garage is approximately 54,500 gsf and is the future home of GTRC and affiliated departments.  As part of Georgia Tech's mission for sustainability, the design will allow for a future solar panel array at the office and garage roofs and provide space for a blackwater reclamation system on the first level of the office building.      

Project Manager
Brad Morris
Occupancy
Start Date