There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m..  Be advised traffic will be re-routed to the Plant, Lyman and Daniel Hall parking areas via the 2nd entrance to Plant Drive.

There will be a closure of Plant Drive between the Plant and Daniel & Lyman Hall on Monday, December 20th from 7 a.m. to 5 p.m..  Be advised traffic will be re-routed to the Plant, Lyman and Daniel Hall parking areas via the 2nd entrance to Plant Drive.  Proceed with caution as this is against the normal flow of traffic around the building (although wide enough to accommodate incoming/outgoing vehicles).  A spotter will be posted at the corner rounding North to the section of Plant Drive to the parking lots to slow vehicles down and warn of oncoming traffic. An additional spotter will be placed on Bobby Dodd to direct vehicles to the 2nd entrance to Plant Drive.

Normal access to Plant Drive will resume on December 21st.  A similar shutdown for the crane to demobilize will occur as soon as December 24th or as late as Monday, December 27th. 

This is Phase I of a project to replace roofing at the Holland Plant.  Subsequent phases will follow during the first quarter of 2022.