The gravel drive between State Street and Atlantic Drive (south of the North Campus Parking Deck) will be closed during construction and will be upgraded to a multi-use path consisting of concrete and asphalt to match the EcoCommons path on the west of State Street.

  • North Campus Parking Deck vehicular and pedestrian circulation will not be affected.
  • Pedestrian access between Atlantic Drive and State Street will be via Peachtree Place (north side of parking deck).
  • Landscape Services and Recycling vehicles will access their facilities via Atlantic Drive.
  • Duration of project is three months.