Professional Service General

Clarifications on contracting and procurement questions. Training document.

Date Modified:

Form is used to start work prior to a contract being executed. Significant extenuating or emergency circumstances are required to request this authorization.  See contracting policy document for instructions.

Date Modified:

Use this form to expedite a contract to the front of the queue in WorkDay.

Date Modified:

GTFI Contracts

Sample routing approval memo for a change order or add service to an existing GTFI contract.

Date Modified:
Date Modified:
Date Modified:

General Consultant agreement to be used with PPV + GTFI projects. (updated 8.4.2017)

Date Modified:

General Consultant agreement Amendment to be used with PPV + GTFI projects. (updated 10.3.18)

Date Modified:

Professional Services Procurement

This website outlines the contracting authority for BOR vs. GT.  Georgia Tech has a Level 4 delegated authority.  Any contracts or projects that exceed these limits go to the BOR for execution.

Date Modified:

BOR Guidelines for Qualification Based selection process, and limitations by contract dollar value.

Date Modified:

This is a guideline from GSFIC for design professional service fees.

Date Modified:

This is a template RFP/Q for Board of Regent contracted work.  Exhibits are included.  

Date Modified:

Spreadsheet to auto calculate and schedule durations required for RFP/Qs

Date Modified:

This RFQ-P template is to be used to procure Design Professional Services for CM/GC Construction Projects. For Use within Chuck Rhode’s signing authority ONLY (for contracts under $600,000)

Date Modified:

Design Professional (Sealed Documents)

Use to amend Design Professional Contract 

Date Modified:

This link is for all design professional contracts.   

Signature for Facilities (in lieu of President) should read: Nazia Zakir, Vice President (Interim), Sustainability, Facilities, & Safety

Date Modified:

Required Documents - All Contracts

This document is required for Design Professionals and Sub-Consultants.

Date Modified:

This resolution is required for all contracts.  

Date Modified:

General Consultant (Documents Not Sealed)

This link is for all general consultant contracts. 
The link will take you to the BOR website, select Design and Construction then scroll down to the General Consultants Agreement. 

Note:  Direct link to the contract is not available so you have to follow the steps above to find the correct contract.

President's Signature should be changed to be: Nazia Zakir

Vice President (Interim), Sustainability, Facilities, & Safety

Date Modified:

Indefinite Delivery, Indefinite Quantity (IDIQ)

This is a one page contract document for use with design professionals who have a master IDIQ agreement.

Date Modified:

Example of how to complete an IDIQ Contract Document, Schedule A

Date Modified:

The design professional amendment form should be utilized to amend an issued (existing) IDIQ Schedule A contract.

Date Modified:

This document is the RFP/Q for procurement of IDIQ base contracts. (This is not for the procurement of IDIQ quotes under an existing contract.)

Date Modified:

IDIQ Contracts February 2017

Date Modified:

Access to IDIQ balances

Date Modified:

Professional Services - Program Management

This is a template RFP/Q for Board of Regent contracted work.  Exhibits are included.  

Date Modified:

Professional Services - Commissioning Agent

Fee Data (35.94 KB)

Fee history on recent GT Projects for enhanced or additional Cx Services such as measurement and verification.

Date Modified:

Specification sections for commissioning that should be tailored to the project by the CxA and provided to the Design Professional for inclusion in project specifications.

Date Modified:

Georgia Tech boiler plate Owners Project Requirements.  Commissioning Agents should use this as the starting point for developing an OPR for GT projects.

Date Modified:

Sample of GT OPR Boiler Plate utilized on a project at programming / concept design.

Date Modified:

Helpful definitions for the Cx Process.

Date Modified:

Description of commissioning process and goals for commissioning at Georgia Tech.

Date Modified:

Checklist of all activities during a capital project commissioning effort.  Includes engagement recommendations for stakeholders.

Date Modified:
Template Cx RFPQ (157.5 KB)

Baseline RFP/Q template for Commissioning at Georgia Tech.

Note that you will need to carefully review this document and replace all yellow highlighted  (non-boiler plate verbiage) with project specific verbiage.

Date Modified: