Crane Staging on Sixth Street, south sidewalk closed temporarily.
The ground level/Dalney Street entrance of the W22-Dalney Deck is currently closed for cleanup.
Covid-19 testing at the parking deck has now ended.
The campus center construction project moves into Phase II.
A large water main break and associated repair will cause some disruption to campus roadways through fall.
Campus Road Closures due to the continuing repair work on water main.
Construction Impacts for Campus Center during the month of September 2020
Improvement project to span 8-week period.
A crane will be staged at the ESM Bldg from 6a-10am on Oct. 24
Work on the Tenth Street Chiller Plant will require a crane to be on-site 2/1, 2/2, and 2/12 resulting in a street closure and detour signs at 9th St. & Hemphill St.

Example accordion content goes here.