Construction Impacts for Campus Center during the month of February 2020
Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.
Construction of the base and associated site work for the Portman sculpture continues..
Construction Impacts for Campus Center during the month of January 2020.
Elevator upgrade will occur from 12/16/19-2/24/20 in the Van Leer Interdisciplinary Commons Building.
A lift will be placed on the sidewalk that runs along the South end of the Stadium between Fowler & Cherry street
Construction Impacts for Campus Center during the month of January 2020.
The crane will be on the premises from 6:00 am to 10:00 am and may disrupt traffic on Power Plant Drive from the parking lot behind Lyman to the main entrance of the building
Construction Impacts for Campus Center during the month December 2019
A lush green space will soon emerge from what was formerly the Beringhause Building and two surface parking lots.